- Issue
- Journal of Siberian Federal University. Engineering & Technologies. 2014 7 (7)
- Authors
- Esyukova, Elena G.; Noskova, Elena E.
- Contact information
- Esyukova, Elena G.:JSC «SPE «Radiosvyaz» 19 Dekabristov Str., Krasnoyarsk, 660021, Russia; Noskova, Elena E.:Siberian Federal University 79 Svobodny, Krasnoyarsk, 660041, Russia
- Keywords
- Operational scheduling; radioelectronic factory; assembly processes; ant colony algorithm
- Abstract
This article describes features of operational scheduling in radioelectronic factory. The main optimization criteria used in preparing the operational schedule of production, with the definition of criteria groups which inhere in the production of electronic assembly processes. It suggest a software implementation of the ant colony algorithm and its modifications, solving the problem of optimal schedules work as global optimization problems in a reasonable time
- Pages
- 779-790
- Paper at repository of SibFU
- https://elib.sfu-kras.ru/handle/2311/16527
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0).