Journal of Siberian Federal University. Engineering & Technologies / The Experience of Using Mining and Geological Information System Micromine for Estimation the Economic Efficiency of Extraction Gorevskoe Pb-Zn Deposit

Full text (.pdf)
Issue
Journal of Siberian Federal University. Engineering & Technologies. 2013 6 (4)
Authors
Makarov, Ilya V.; Pronskiy, Valeriy A.
Contact information
Makarov, Ilya V.: Siberian Federal University, 79 Svobodny, Krasnoyarsk, 660041 Russia; e-mail: ; Pronskiy, Valeriy A.: Novoangarskiy OK, 9 Prosvechenia, Novoangarsk, 663412 Russia;
Keywords
economic efficiency of mining Gorevsky deposit; variogram; block model; pit optimization; Lerch-Grossman algorithm; ultimate pit
Abstract

In this article describes the experience of block modeling Gorevskoe deposit. The main purpose is to estimation the economic efficiency of extraction deposit with using mining and geological information system Micromine. The article describes four scenarios for reserve development of Gorevskoe deposit: Mining of ore bodies located under the Angara rive r Without mining of ore bodies located under the Angara rive r Mining of ore bodies located under the Angara river with transfer processing plan t Mining of ore bodies located under the Angara river, with combine open pit and undergroun d mining . The evaluation of all scenarios is the most cost-beneficial scenario is mining of ore bodies locate d under the Angara river with transfer processing plant .

Pages
374-386
Paper at repository of SibFU
https://elib.sfu-kras.ru/handle/2311/9848

Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0).